Porvoon lämpöakku

CUSTOMER: porvoon energia/novox oy

New 10 000m³ thermal battery and boiler for district heating was constructed in Seinäjoki. The battery can store 400 MWh energy. The boiler’s capacity is 40 MW.

2020-2022

MAIN CONRACTOR, SITE MANAGER

The 10 000m³ thermal battery works as an energy storage, balancing production fluctuations caused by demand peaks. Environmental friendliness of energy production increases as less non-renewable energy sources needs to be used. The thermal battery also stands as a backup storage for district heating water.

Culmentor’s role in the project: Main contractor; construction, site management, building supervision.